China Suppliers Factory Large Solid Asphalt Melting Tank Equipment for Efficient Heat Exchange and Asphalt Processing
Product Description
For general melting volumes that are relatively large (2 - 15 t/h), a vertical coil structure is adopted; for smaller melting volumes (1 - 2 t/h), a horizontal tube bundle structure is used; for very small melting volumes (for testing purposes - 100 - 1000 kg/h), an electric heating structure is employed. While for block asphalt, an intermittent (discontinuous) tube bundle structure is generally used.
Main Structure
The main structure consists of an asphalt tank body (upward straight and downward conical), a heat transfer oil heating coil (inner and outer coils and conical coil), a stirring system (motor reducer, support), and a support frame (upper and lower supports and columns). It is also equipped with electronic weighing sensors, digital thermometers, a bottom discharge mechanism, an asphalt filter, and an asphalt buffer (receiving) tank.
Working Principle
Melting Zone Entry: Solid asphalt enters through the feeding port. High-temperature heat transfer oil in the coils melts the asphalt, while an agitator ensures uniform heating. High-quality liquid asphalt is pressed into the secondary zone, while slag settles in the conical area.
Secondary Heating: Asphalt enters the secondary zone for further heating, dehydration, and impurity sedimentation. Once the temperature and level meet requirements, qualified asphalt is discharged through a filter to the storage tank via an insulated pump.
Discharge & Maintenance: The bottom features a discharge valve and manhole. Impurities are removed through the slag mechanism. Maintenance personnel can access the interior via the bottom manhole when the tank is empty.
Temperature Control: A measuring point at the outlet monitors temperature to control the heat transfer oil valve. This regulates melting speed and prevents asphalt aging caused by overheating.
